If an engine generator fails and the APU is not available to power
the opposite Transfer Bus, what occurs if an electrical overload
exists ?
Automatic load shedding starting with the galleys and main bus on
Transfer Bus 2. If an overload continues, subsequent load
shedding will take place as follows:
Galleys and main bus on Transfer Bus 1.
IFE Busses.
Ground Power and Bus Switching Panel
|